We fit in around your build-up.

We book our own venue delivery slot, install the pod when your stand is ready for it and collect after breakdown. Here's what to plan for.

Logistics

What arrives on site.

Each pod arrives flat-packed and is assembled on the stand by our two-person crew.

Installation timeAbout 30 minutes (Call), 40 minutes (Focus), 45 minutes (Meet 2 and Meet 4)
Heaviest podLull Meet 4, about 470–610 kg assembled
Floor loadCheck raised stand floors for a point load of up to about 610 kg over 2.7 m²
PowerOne 13A socket per pod, ordered by the exhibitor
Clearances800 mm in front for the door, 200 mm above for ventilation
PackagingTaken away by our crew; nothing left on or behind the stand

On the day

How installation runs.

Payment in full confirms your booking. See our hire terms.

  1. We confirm the slot

    We agree a time with you once the stand floor and walls around the pod are in place.

  2. We deliver

    Our van arrives in its booked venue slot.

  3. We build

    Two people assemble the pod and fit any branding.

  4. We collect

    After breakdown, in a booked collection slot.

Building a stand with a pod?

Send us the show, stand number and your build schedule.